Go to main content

Skidmore College identified Daniels Road land parcel for renewable energy expansion. Two build scenarios of 4MW turbine vs four 1MW turbines, with a potential of generating 31% of Skidmore's electricity demand were analyzed. Three ownership models were studied, and PPA was found to be the most cost-effective option. Solar and other renewables should also be explored for future land use, as Skidmore-owned scenarios are not feasible.

Metric
From
To
Interval
Export
Download Full History